Electrical contractor Chippewa Eau Claire Wisconsin.
Eau Claire Wisconsin. Moved fuse box out of bathroom. Installed 200 amp Cutler Hammer CH panel and meter main outside.
200 amp service upgrade Eau Claire Wisconsin. Relocated Meter socket and panel.
What I do for bitcoin. Federal pacific panel change out to 40 space Square D QO panel.
Panel change out student rental Eau Claire Wisconsin Check out circuit #7
Burlington WI. SE cable in very poor condition it sparked out in the meter when I was there.
Check out this splice I found burried in the wall. I cut the whole mess out.
Lynn Ave Altoona tree fell on overhead line . full soffit with gutter ripped off of house. Installed service mast above roof . No wires in the way for the Carpenter to fix the massive roof rip.
Bloomer Wisconsin. This mess was on a landing on the stairs. relocated this into the basement. Changed out 100 amp Federal pacific panel to Square D QO 200 amp.