real estate developer of missing middle housing in Toronto
Paul's avatar
Paul 1 year ago
DC avoidance - pivot back to triplex + GS strategy for Coxwell
Paul's avatar
Paul 1 year ago
first and second floor complete - Jones
Paul's avatar
Paul 1 year ago
pre slab gravel and insulation - Gerrard LWS
Paul's avatar
Paul 1 year ago
bulkhead framing & drywall - Gerrard
Paul's avatar
Paul 1 year ago
Investigating helical piles + slab for Jones GS - first floor height is 6" above grade
Paul's avatar
Paul 1 year ago
new first floor above old - lvl ledger board connected to existing masonry wall with 3/4" anchor wedge bolts - Jones
Paul's avatar
Paul 1 year ago
spiral stair second egress design - Gerrard
Paul's avatar
Paul 1 year ago
Water line re-run. 2.44m horizontal clearance from sewer line + protective sleeve and tracer wire - Gerrard
Paul's avatar
Paul 1 year ago
Trench footing poured & ducting commenced - Gerrard
Paul's avatar
Paul 1 year ago
LWS trenching - Gerrard
Paul's avatar
Paul 1 year ago
LWS drain and water connection - Gerrard
Paul's avatar
Paul 1 year ago
LWS utility trench - Gerrard
Paul's avatar
Paul 1 year ago
125a per unit + 100a house meter image