DC avoidance - pivot back to triplex + GS strategy for Coxwell
Paul
paul@cosanostr.com
npub152wq...tmf6
real estate developer of missing middle housing in Toronto
first and second floor complete - Jones


pre slab gravel and insulation - Gerrard LWS


bulkhead framing & drywall - Gerrard


Investigating helical piles + slab for Jones GS - first floor height is 6" above grade
Jones


new first floor above old - lvl ledger board connected to existing masonry wall with 3/4" anchor wedge bolts - Jones


spiral stair second egress design - Gerrard


Water line re-run. 2.44m horizontal clearance from sewer line + protective sleeve and tracer wire - Gerrard


Drains - Gerrard



Trench footing poured & ducting commenced - Gerrard


Jones


LWS trenching - Gerrard


Jones


LWS drain and water connection - Gerrard


LWS utility trench - Gerrard


Gerrard


Jones


125a per unit + 100a house meter