Fire Department Access Requirements: Garden Suites Path of Travel Width & Height: Minimum 1.0m wide by 2.1m high. Location: Path can be on the property or shared with a neighbor via a Limiting Distance Agreement. Protrusions Allowed: Hydro, gas meters, and other similar features may project into the path. Travel Distance: Max 45m from a public street to the suite entry. Hydrant Proximity: Fire hydrant within 45m of the fire truck's location at the street or flanking street. Laneway Suites Path of Travel Width & Height: Minimum 0.9m wide by 2.1m high. Location: Path can be on the property or shared via a Limiting Distance Agreement. Protrusions Allowed: Hydro, gas meters, and similar features may project into the path. Travel Distance: Max 45m from a public street or max 90m through a laneway if additional fire-safety measures are added. Hydrant Proximity: Fire hydrant within 45m of the fire truck’s location on a public street or flanking street.
Paul's avatar
Paul 1 year ago
Blockwork begins - Jones
Paul's avatar
Paul 1 year ago
Subfloor - Gerrard LWS
Paul's avatar
Paul 1 year ago
2nd floor joists up on west side.....TJI 560s @ 16" O.C. - Gerrard
Paul's avatar
Paul 1 year ago
Resilient channel between drywall layers for extra sound proofing - Gerrard
Paul's avatar
Paul 1 year ago
Power connected, TH meters installed, framing on LWS - Gerrard
Paul's avatar
Paul 1 year ago
First walls up - Gerrard LWS
Paul's avatar
Paul 1 year ago
LWS slab, basement walkout steps poured and 16" sonotube with bigfoot for spiral stairs - Gerrard
Paul's avatar
Paul 1 year ago
Slab pour - Gerrard LWS
Paul's avatar
Paul 1 year ago
DC avoidance - pivot back to triplex + GS strategy for Coxwell
Paul's avatar
Paul 1 year ago
first and second floor complete - Jones
Paul's avatar
Paul 1 year ago
pre slab gravel and insulation - Gerrard LWS
Paul's avatar
Paul 1 year ago
bulkhead framing & drywall - Gerrard
Paul's avatar
Paul 1 year ago
Investigating helical piles + slab for Jones GS - first floor height is 6" above grade
Paul's avatar
Paul 1 year ago
new first floor above old - lvl ledger board connected to existing masonry wall with 3/4" anchor wedge bolts - Jones
Paul's avatar
Paul 1 year ago
spiral stair second egress design - Gerrard
Paul's avatar
Paul 1 year ago
Water line re-run. 2.44m horizontal clearance from sewer line + protective sleeve and tracer wire - Gerrard