Paul 9 months ago
Walls primed + flooring start Gerrard LWS
Paul's avatar
Paul 10 months ago
New building code restriction: openings in exterior walls within 3 meters horizontally and less than 5 meters above unenclosed exterior exit stairs or ramps need to be fire protected
Paul's avatar
Paul 10 months ago
Jones GS - Slab poured.. delayed weeks due to low temps
Paul's avatar
Paul 10 months ago
Shower glass & Door hardware - Gerrard
Paul's avatar
Paul 11 months ago
Drywall - Gerrard LWS
Paul's avatar
Paul 11 months ago
Kitchens and Paint - Gerrard
Paul's avatar
Paul 11 months ago
Heat pump installation - Gerrard image
Paul's avatar
Paul 11 months ago
Insulation - Gerrard LWS
Paul's avatar
Paul 11 months ago
Duct work - Gerrard LWS
Paul's avatar
Paul 11 months ago
GS Framing progress. Fourplex waterproofing, sump installed, gravel ready for concrete - Jones
Paul's avatar
Paul 0 years ago
Spiral Stair install - 25'9" - 3 landings with outer handrail 1070mm high, clear width between handrails 660mm, risers not more than 240mm, minimum of 190mm deep run at 300 mm from center line of handrail - Gerrard
Paul's avatar
Paul 0 years ago
Stucco in rain - Gerrard LWS image
Paul's avatar
Paul 0 years ago
Drains + GS connection - Jones
Paul's avatar
Paul 1 year ago
Decent size footings. Sewer pipe a good 4' down = good slope. Jones
Paul's avatar
Paul 1 year ago
Finish on sides of LWS or GS only component required to be non-combustible
Paul's avatar
Paul 1 year ago
Basement Walkout - Jones
Paul's avatar
Paul 1 year ago
Foundation - Jones GS