Busy here prepping for the real work to start. After the engine was out it was time for the mast out. After that we’ll be moving into a shed to begin the big rebuild of the cabin and some of the deck.
We’ll be replacing the balsa core deck and cabin with a high density foam and using epoxy and fibreglass to strengthen and hold it together.
Plan is to widen the cabin while we’re at it and to raise it the width of the core material.
Login to reply